water were pumped into the remaining lake beyond               1  Crown Land applied for or taken by State

     the stopbanks.                                                     Coal Mines under Part III of the Coal
          The  free  water  surface  of  the  lake  was                                 Mines  Act, 1925.
     reduced  in  this  way  from  316  hectares  to  58            2  Unoccupied Crown Land.
     hectares.                                                      3   Land owned by Waikato County.
           Coal  Mining  proceeded  in  a  generally  north        4    Crown Land under application for
     easterly  direction  with  strippings  being  placed                  ownership by Huntly Borough.
     beyond the stopbank, and later in the mined areas.            The  majority  of  the  area  is  Unoccupied
     The  areal  photo  is  a  composite  showing  the  Crown  Land  and  land  applied  for  taken  under

     mine  in  1963  when  disruption  to  the  Part III of the Coal Mines Act 1925.
     surrounding  land  was  at  its  height.  Since               The  entire  study  area  (including  the
     cessation  of  opencast  mining  in  1976,  natural  opencast)  is  shown  in  the  Waikato  County
     revegetation has taken place and the majority of  District Scheme zoning maps as Lake, and has an
     the mine affected land is covered by sparse toitoi  underlying Rural A Zoning.
     and other hardy plants.                                       The  following  land  uses  were  identified  in
                                                              the area to be rehabilitated:
     The Future of Kimihia
     Most  of  the  area  of  Kimihia  Opencast  is  below  The Opencast
     river level, and water enters the mine by seepage
     from  the  walls  and  surface  run-off  requiring            The Kimihia Opencast can be considered in
     continuous  pumping  from  the  floor  of  the           simple  terms as a hole in the ground surrounded
     opencast.  This  must  continue  for  the  life  of  the   by spoil which has been taken from that hole. The
     East Mine to prevent flooding of the underground         area  of  spoil has  in  places  reverted to other land
     workings.  When  underground  mining  ceases,  the       uses  and  is  dealt  with  later,  or  now  lies  fallow
     pumps  will  be  shut  off  and  the  opencast  will     supporting casual recreational use.
     slowly  fill  with  water  to  form  a  new  deep  lake       The  pit  is  oval  in  shape,  being  350  metres
     within part of the original Lake Kimihia. This is        wide and  1,200 metres long and 50 metres deep.

     not expected within 25 years.                            The northern walls of  the pit have been cut from
          The rehabilitation plan for Kimihia is focussed     the  soil  and  rock  covering  the  coal  seams,  and
     on this eventual lake, but provides for interim land     represent  the  final  working  face  of  the  mine,
     uses  within  the  opencast  during  under-ground        while  the  southern  and  eastern  walls  have  been
     mining.  Earthworks,  soil  preparation  and             constructed  with  the  spoil  excavated  from  the
     planting within the mine and along the eventual          north and backfilled into  the worked-out area of
     beaches are designed to accommodate the eventual         the pit.
     lake  and  to  cater  for  productive  and  compatible
     land uses prior to the formation of the lake. The             The cut and fill slopes forming its walls
     sketch is an artist's impression of the opencast as      are  constructed  at  the  maximum  safe  angle  and

     it may look in the future.                               highest  faces  between  benches.  For  the  material
                                                              exposed  in  the  northeast  corner  of  the  opencast,
          Beyond  the  present  opencast,  the  mine          these limits were perhaps exceeded toward the end
     disturbed  land  to  the  perimeter  of  the  original   of  mining,  and  slips  have  developed  at  these
     lake  is  included  in  the  rehabilitation  proposals   places.  The  only  land  use  within  the  pit  is  the
     and  land  uses  compatible  with  the  eventual  lake   development  and  associated  surface  installations
     have been recommended by the consultants,  and
     are being encouraged and financially assisted by         of the Huntly East Mine.

     State Coal Mines.
                                                              Underground Mine
              KIMIHIA - THE STUDY AREA
                                                                    The  Huntly  East  Mine  is  an  underground
          A     fundamental         requirement        for    mine  with  portals  to  the  three  inclined  drives
     s u c c e s s f u l    rehabilitation  of  the  Kimihia   located  within  the  old  opencast.  Coal  won  from
     Opencast  is  compatibility  between  existing  and      this mine will be lifted by conveyor to a road and
     proposed adjacent land uses, and due  recognition        rail head under construction on the south­eastern
     of  water  quality  and  drainage  aspects.  The  area   rim  of  the  opencast.  A  new  road  and  parallel
     considered  in  the  study  therefore,  included  land   railway is nearing completion to connect the coal
     beyond the Opencast, particularly Lake Kimihia,          preparation  and  storage  plant  with  State

     and all the low lying area not in pasture.               Highway 1 and the main trunk railway line.